(含图)
An architect is working on an airport lounge project. The 9,000 SF floor plan includes an open,
double-height space. Due to area limitations, all program requirements cannot fit within the 9,000 SF
floor plan. A mezzanine level with one exit is being proposed to solve this programming constraint.
There are adequate exits available on the main floor plan to pick up the additional occupant load
from the mezzanine.
Which method of mezzanine construction should the architect design?