单选题 622. When notching and boring studs in bearing walls, you must not cut more than:(在承重墙立柱上开槽和打孔时,最大不得超过多少?)

A、 40% when boring, 25% when notching(打孔40%,开槽25%)
B、 25% when boring, 40% when notching(打孔25%,开槽40%)
C、 35% when boring, 20% when notching(打孔35%,开槽20%)
D、 20% when boring, 35% when notching(打孔20%,开槽35%)
下载APP答题
由4l***36提供 分享 举报 纠错

相关试题

单选题 501. What is the minimum height of a toilet seat from the floor?(坐便器座圈离地面的最小高度为:)

A、 15”
B、 16”
C、 18”
D、 20”

单选题 503. Where is the sole plate located when framing?(木结构施工中,底板(sole plate)的位置是?)

A、 Above the sill(在地枕梁(sill)之上)
B、 Below the sill(在地枕梁之下)
C、 Attached to joist(直接连在楼板托梁上)
D、 Attached to rafter(连在椽子上)

单选题 507. How do you find out what type of concrete to use?(如何确定应使用哪种强度等级/配比的混凝土?)

A、 Soils engineer report and recommendation(根据岩土工程师报告与建议)
B、 Recommendation by the supplier(由材料供应商推荐)
C、 Ask city inspector(问市政验收官)
D、 Search on local standard(自行查当地标准)

单选题 506. What is the common name of the Freon recovery unit?(氟利昂回收装置的常用名称是?)

A、 Recovery/recycling machine(回收/再生机)
B、 R-134a(制冷剂R-134a)
C、 R-22(制冷剂R-22)
D、 R-410a(制冷剂R-410a)

单选题 504. What would you use when installing an electrical system above a roof?(在屋顶以上安装电气系统时,你会使用哪种部件?)

A、 PVC(PVC 管)
B、 A weather head(电缆进户防雨弯头/风帽)
C、 Drip edge(滴水檐口)
D、 Weather strap(防风带)

单选题 508. Which of the following is used to connect two pipes of different sizes?(下列哪种配件用于连接不同管径的两根管?)

A、 Coupling(直接头/接管)
B、 Nipple end(短管接头)
C、 Bushing(异径套管/补芯)
D、 Tapping tee(开孔三通)

单选题 502. Handrails must be installed above the surface of a handicap ramp.(无障碍坡道上的扶手安装高度范围应为:)

A、 30" to 33"
B、 32" to 36"
C、 34" to 38"
D、 34" to 36"

单选题 505. What does the writing on the head of a hex bolt represent?(六角螺栓头上的标记代表什么?)

A、 Rating(等级/强度等级)
B、 Factory number(工厂编号)
C、 Size(尺寸)
D、 Material(材质)