单选题 Question #2. Regression testing should be performed: v) every week w) after the software has changed x) as often as possible y) when the environment has changed z) when the project manager says

A、 v & w are true, x, y & z are false
B、 w, x & y are true, v & z are false
C、 w & y are true, v, x & z are false
D、 w is true, v, x, y & z are false
下载APP答题
由4l***40提供 分享 举报 纠错

相关试题

单选题 Question #9. Which of the following is the main purpose of the integration strategy for integration testing in the small?

A、to ensure that all of the small modules are tested adequately
B、to ensure that the system interfaces to other systems and networks
C、to specify which modules to combine when, and how many at once
D、to specify how the software should be divided into modules

单选题 Question #1. A deviation from the specified or expected behaviour that is visible to end-users is called:

A、an error
B、a fault
C、a failure
D、a defect

单选题 Question #8. Which of the following is NOT part of configuration management?

A、auditing conformance to ISO 9000
B、status accounting of configuration items
C、identification of test versions
D、controlled library access

单选题 Question #7. Non-functional system testing includes:

A、testing to see where the system does not function correctly
B、testing quality attributes of the system including performance and usability
C、testing a system function using only the software required for that function
D、testing for functions that should not exist

单选题 Question #4. When should testing be stopped?

A、when all the planned tests have been run
B、when time has run out
C、when all faults have been fixed correctly
D、it depends on the risks for the system being tested

单选题 Question #6. Consider the following statements about early test design: i. early test design can prevent fault multiplication ii. faults found during early test design are more expensive to fix iii. early test design can find faults iv. early test design can cause changes to the requirements v. early test design normally takes more effort

A、i, iii & iv are true; ii & v are false
B、iii & iv are true; i, ii & v are false
C、i, iii, iv & v are true; ii is false
D、i & ii are true; iii, iv & v are false

单选题 Question #5. Order numbers on a stock control system can range between 10000 and 99999 inclusive. Which of the following inputs might be a result of designing tests for only valid equivalence classes and valid boundaries?

A、1000, 50000, 99999
B、9999, 50000, 100000
C、10000, 50000, 99999
D、10000, 99999, 100000

单选题 Question #3. IEEE 829 test plan documentation standard contains all of the following except

A、test items
B、test deliverables
C、test tasks
D、test specifications