单选题 Uncoupling of this system must ( ) place in a yard or shop.

A、 take
B、 be
C、 taken
D、 took
下载APP答题
由4l***4i提供 分享 举报 纠错

相关试题

单选题 RailTraq is not responsible ( ) delays to departure or arrival times.

A、to
B、by
C、for
D、in

单选题 These bar couplers are preferable ( ) semi-permanent coupling.

A、at
B、in
C、of
D、for

单选题 The way cab signaling is used depends ( ) whether the system is intermittent or continuous.

A、of
B、on
C、with
D、in

单选题 It consisted mainly ( ) decisions made by local signal operators or members of the train crew.

A、with
B、by
C、of
D、for

单选题 We’ve come a long way ( ) the link and pin coupling of old.

A、at
B、in
C、with
D、from

单选题 The use of satellite information, microwaves, and data links are adding ( ) new train management systems.

A、for
B、to
C、in
D、at

单选题 Fees may apply ( ) the case of cancellation.

A、in
B、by
C、at
D、on

单选题 A stop is a designated point on a rail line for passengers to ( ) and exit a train.

A、up
B、get
C、move
D、board