单选题 In the construction of concrete structures, the formwork with convenient disassembly and strong universality is ( ). ,、

A、 Combined steel formwork
B、 Large formwork
C、 Climbing formwork
D、 Sliding formwork
下载APP答题
由4l***ld提供 分享 举报 纠错

相关试题

单选题 For a cantilever cast-in-place balcony with a span of 1.5m and a strength of C25, the formwork can be removed when the concrete strength reaches ( ).1.5m,C25,( ),。

A、 22.5MPa
B、 25MPa
C、 30MPa
D、 15MPa

单选题 The main load-bearing structure of the pier abutment is ( ).

A、 Prefabricated components
B、 Abutment surface
C、 Abutment
D、 Steel beam

单选题 Binding connection is adopted for 8 identical longitudinal steel bars in a beam. The maximum connection joints allowed within a connected section is ( ).8。

A、 4
B、 6
C、 1
D、 2

单选题 Among the strength grades of masonry mortar, the highest strength is ( ). ,

A、 M25
B、 M15
C、 M10
D、 M20

单选题 The fullness of horizontal mortar joints in brick masonry should be no less than ( ).

A、 60%
B、 80%
C、 90%
D、 70%

单选题 Generally, mixed mortar should be used up within ( ) after mixing.( )

A、 5h
B、 2h
C、 4h
D、 3h

单选题 When lifting the columns, the main content of its correction work is ( ). ,

A、 Verticality
B、 Column bottom elevation
C、 Plane position
D、 Column top elevation

单选题 Which of the following options is not used as a basis for determining the gradient of soil slope? ( )

A、 Soil quality and excavation depth
B、 Tender offer
C、 Period of use
D、 Load situation on slope