使用当前浏览器访问考试宝,无法享受最佳体验,推荐使用 Chrome 浏览器进行访问。
更新时间: 试题数量: 购买人数: 提供作者:
有效期: 个月
章节介绍: 共有个章节
我的错题 (0道)
我的收藏 (0道)
我的斩题 (0道)
我的笔记 (0道)
顺序练习 0 / 0
随机练习 自定义设置练习量
题型乱序 按导入顺序练习
模拟考试 仿真模拟
题型练习 按题型分类练习
易错题 精选高频易错题
学习资料 考试学习相关信息
The air distribution system supplies air conditioning to the flight deck is from:
The trim air pressure regulator valve controls:
The alternate ventilation system (AVS) lets:
The upper recirculation fan functions is:
The trim air is from:
Purpose of zone duct temperature sensors is:
Purpose of humidifier shutoff valve is:
The temperature control system is a system for adjustment and control of temperatures in each zone of :
Purpose of the upper recirculation heat exchanger (URHX) is:(787-9)
Purpose of the flight deck shoulder duct heaters are:
Size of flow control orifices holes in air conditioning distribution supply duct:
The flight deck air supply boost fan operates for any of these conditions::
The following description abuot the zone duct temperature sensor ,which is right?
Which condition does AVS(Alternate Ventilation System) operate?
When the AVS of 787-9 operates,which component will be operated
AVS(Alternate Ventilation System) is controlled by: