An architect is responsible for the lifecycle management design for a brownfield  vSphere-based solution. The following information has been provided during initial  meetings around the new solution:

Existing  heterogeneous  server  hardware  will    be  used  to   provide  the   hosting platform.

The available hardware is:

10 servers that   contain  2  x   20-Core  Intel  Xeon   processors  and  512   GB  RAM  from Vendor A

10 servers that   contain  2  x   24-Core  Intel  Xeon   processors  and  768   GB  RAM  from Vendor A

20 servers that contain 2 x  16-Core AMD  EPYC   processors  and  512 GB  RAM from Vendor B 。

10 servers that contain  1 x  24-Core AMD  EPYC   processors  and  256 GB  RAM from Vendor B

All of the hardware is currently listed on the VMware Hardware Compatibility List (HCL).

All  existing  server    hardware  has  36  months  vendor  support   remaining.  The requirements from the customer are:

 REQ001 - The solution must support the hosting of 5,000 workloads spread across two physical sites.

REQ002 - The solution should minimize the number of clusters.

REQ003   -  The  solution   must  ensure  that  there  is  no  impact  to  service  when completing upgrades.

Given  the   resource  requirements  needed  for   the  solution,   the   architect   has calculated that all of the existing servers will be required to provide sufficient resources for the new environment.

The Intel-based (Vendor A) servers will be deployed to the primary site and both the Intel-based and AMD-based servers (Vendor B) will be deployed to the secondary site.

Which assumption should the architect make to support the lifecycle management of vSphere 8?