使用当前浏览器访问考试宝,无法享受最佳体验,推荐使用 Chrome 浏览器进行访问。
更新时间: 试题数量: 购买人数: 提供作者:
有效期: 个月
章节介绍: 共有个章节
我的错题 (0道)
我的收藏 (0道)
我的斩题 (0道)
我的笔记 (0道)
顺序练习 0 / 0
随机练习 自定义设置练习量
题型乱序 按导入顺序练习
模拟考试 仿真模拟
题型练习 按题型分类练习
易错题 精选高频易错题
学习资料 考试学习相关信息
requests. Issues can have multiple keywords, and new keywords can be added at any time. They
want to see keywords displayed prominently when viewing all cards on a board. Which configuration
meets this need?
Jira?
* allows different options in different projects
* allows options to be disabled where necessary
* allows only a single value
* allows a default value to be configured
Which field meets these requirements?
The first thing you do is to analyze the Velocity Chart of the team's scrumboard as shown(含图)
drag-and-drop to:
3IT Certification Guaranteed, The Easy Way!
* quicklyassign and transition them to in Progress
* instantly associate them with Epics
Which board view will meet these requirements?
of age. Now, the team wants to do a periodic clean-up of the Done column.
* They want to do the clean-up whenever it is needed on an ad-hoc basis.
* They want to be able to report on all the issues that were removed during each clean-up.
Which solution meets their need?
Dave creates an issue and wants to use the auto-assignment feature of Jira. Which statement is
definitely correct?
She also needs to plan, start, and complete sprints, and to edit sprint goals and dates Where must
Anu be added onto?
Which report can provide an instant progress overview of all fix versions across all projects?
You are a project administrator in DEV.
Which workflow change im.si definitely he escalated to a Jira administrator?
Project lead(含图)
To test thetriaging process you create the first issue in the project and select the Macbook 13"
component. You don t update the assignee field and leave it to the default value of Automatic.
Based on the current configuration, which value will the assignee field show after creating the test issue?
Howmany of them will be available in the versions panel of the project backlog?
members have Edit Issues permission in this project. Which field can definitely be set allproject team
member-."1
Browse Projects permission is granted to a single group. What does Bob need to see all the issues?
Identify the correct solution.
needed insight?
Issues are associated with each team using a custom field called Jean.
Parallel sprints have been disabled.
Which setup will provide each team with an individual Burndown Chart?
project:
* the total count of all issues
* the total count of each issue type
* the distribution of each issue type as a percentage
* a graphical chart display of that percentage
Which gadget meets this need?